
Rate Sorted Quote writer
Quote writer: turn your day rate into a priced quote
Free, no login, and your numbers stay in your browser.
- Type your day rate and the days.
- Add your rooms and materials.
- Press Save my quote for the PDF.
Sample data: change any figure to make it yours.
About a day and a half left.
For the work and preparation, out of the four days you said.
- You said
- Four days
- Walls and ceilings
- About two and a half days
- The walls
- Heavy filling
- Gloss
- At least 16 hours between coats
Is four days enough?
The job behind it
Change anything here and the days above move.
Walls 37.44 m²Ceiling 15.12 m²
Walls 27.84 m²Ceiling 8.40 m²
Drawn to one scale from your own numbers.
Walls and ceilings88.80 m²
Walls and ceilingWoodwork, in for gloss
Two coats over heavy filling.
Whose document it is
Your details go on it once and stay on this device.
Typed once. Saved on this device, never sent to us.
What your customer sees
The same figures, on the sheet your customer reads.
Lounge4.2 by 3.6 m, 52.56 m²
Back bedroom3.0 by 2.8 m, 36.24 m²
The workWalls and woodwork, two coats
Time on siteFour days
Materials£180
TotalYour total lands here
Customer supplying the colours.
Made with Rate Sorted
Save it
The sheet beside this, as a PDF you can send or print.
We ask for your email once, on the download only.
Still to add: your day rate, so there is a total, your trading name, who it is for, a quote number, a date.
Sample data: the room sizes, the days and the materials are the entries this screen opens with.
They are not published figures.
Change any of them and they become yours.
Before you send it, and after
- Profit checkWhat the job actually leaves you
- Worked quoteA quote template with every sum shown
- InvoiceA free template to bill the job
- MaterialsThe materials calculator, waste included
- Day rateWhat a decorator should charge per day
- Hourly rateWhat a painter and decorator charges an hour
- Van costsWhat your van costs per working day
- MethodologyEvery figure behind the rates
If a customer wants a figure first, send them to the tool that prices one room.
Day check sources
Published productivity rates, and the one assumption we add.
The check uses published productivity rates for painting walls and ceilings.
For gloss it uses the manufacturer recoat time.
It covers preparing and applying two coats as one job.
That is why a different coat count gets no benchmark, rather than a scaled one.
The rates, their sources and the one assumption we make about productive hours are set out in full.
They are on how long decorating takes.
The days on your quote are your own.
Nothing here replaces them. Nothing here blocks you.