
For decorators quoting a job
Painting and decorating quote template
A worked job, priced line by line.
Two rooms, 4 days on site, and one total at the bottom.
Copy the wording, change the figures, and send it.
The day rate on it is the calculator’s own answer. Rates reviewed October 2026.
- One page, in plain words, with the prep named before the price.
- The rooms measured, so the days on site can be checked.
- Labour and materials split out, and one total at the bottom.
- A line saying what is not included. Disputes start there.
Every template shows a total. This one shows the arithmetic behind it.
The quote, filled in
A sample job at £256 a day, in two rooms of an ordinary house.
| Room | Wallsand ceiling |
|---|---|
| Living room, 4.2 by 3.6 m | 52.56 m² |
| Hallway, stairs and landing, 5.5 by 2.1 m | 48.03 m² |
The work is walls only, two coats, with filling, sanding and masking included.
The area is the room measured out, which is how the quote writer records it.
| Time on site | 4 days |
|---|---|
| Labour | £1,024 |
| Materials, supplied | £216 |
| Total | £1,240 |
Not included. Moving heavy furniture, plaster repairs, woodwork.
VAT. A blank line, for you to fill in either way.
Payment. A blank line for your own terms, which we do not write.
- Work agreed in a customer’s home carries a right to cancel.
- This template does not carry that wording, and we are not the ones to write it.
- Ask a solicitor, or Citizens Advice, before you hand it to anyone.
Where the total comes from
Four lines. Every one of them is a sum you can repeat.
| Line | Amount |
|---|---|
| Labour, 4 days at £256 | £1,024 |
| Materials at cost, paint and sundries | £180 |
| Your markup on them, 20% | £216 |
| Quote the job at, labour plus materials | £1,240 |
The rooms check the days. They never set the price on their own.
Quotable
A quote is not an estimate
Say exactly what is included, and exactly what is not.
Put an expiry date on it, so the customer knows how long the price stands.
Call it an estimate in writing, in as many words.
Say what would change it, and agree how you will tell them.
Send a quote for work you can see, and an estimate for work you cannot.
Questions about quoting a decorating job
What should a painting and decorating quote include?
Your details, the customer’s, the rooms, the prep, the paint and the coats.
Then the price, what is not included, when you can start, and how long the price stands.
How do I quote a painting and decorating job?
Measure the rooms, then set the days the work will take.
Days times your day rate is the labour. Add materials, then list what is not included.
Should paint be included in the quote?
If you supply it, yes, with your own markup for fetching and carrying.
The example above charges £180 of materials at £216.
How much tax should I put aside from this job?
The profit in it is £1,060, the labour plus what you made on materials.
Put £196 aside, which is 18.5% of that at a £43,556 year.
Can I use it as an invoice?
Yes. Change the heading to Invoice, add your payment details and a due date.
The rooms, the days and the totals all stay exactly as they are.
Can I download it as a PDF or Word file?
The quote writer makes a PDF from your own figures. Your email address unlocks it.
There is no Word or Excel version.
Read next
Reviewed on .
These figures use the same sums as the free calculator. The two always agree.