Building quote template

A builder’s quote template for UK builders, filled in and priced line by line.

Fill it in with my figures

Free with no login, and the day rate is the calculator’s own answer, reviewed November 2026.

A builder’s price stands or falls on the day rate behind it. The £39 General builder Rate Book prices every job, writes the quote and the invoice, and sets the tax aside.Get My Rate Book
What your customer receives
  • One page in plain words, the work set out step by step.
  • The days on site, so the customer can see what the labour buys.
  • Labour and materials split out, with one total at the bottom.
  • A line saying what is not included, which is where disputes start.

The quote, filled in

A sample building job priced at the day rate a general builder needs.

Sample data: swap the scope of work and the pricing for your own.

Quote 027
Your business name, phone, email and address sit at the top, and the customer’s underneath.

The job. Kitchen to dining room knock through, with a steel beam.

  • Prop the wall and take it out
  • Fit the steel on padstones
  • Make good the opening ready for the plasterer
The price on the sample quote
Time on site6 days
Labour£1,992
Materials, supplied£1,380
Total£3,372

Not included. Engineer’s calculations, building control fees, plastering and decorating.

VAT. A blank line, for you to fill in either way.

Payment. A blank line for your own terms, which we do not write.

Before you use it
  • Work agreed in a customer’s home carries a right to cancel.
  • This template does not carry that wording, and we are not the ones to write it.
  • Ask a solicitor, or Citizens Advice, before you hand it to anyone.
A subcontractor in a hi vis vest reads a payment statement at his van on a muddy site. Generated image.
The quote is the first paper the customer sees, so the figures on it have to hold.
Fill it in with my figuresFree, no login, and the sums are done from your own day rate.

Where the total comes from

Three parts, and every one is a sum you can repeat.

  • Labour£1,992
  • Materials at cost£1,150
  • Your markup£230
How the quote total is reached, line by line
LineAmount
Labour, 6 days at £332£1,992
Materials at cost£1,150
Your markup on them, 20%£230
Quote the job at£3,372

The £332 is the day rate calculator’s answer for a general builder on its starting figures.

A site cabin desk with binders, drawings, a calculator and a hard hat, scaffolding outside. Generated image.
Set the days first. The day rate does the rest of the sum.
Cite this figure
A 6 day building job at a £332 day rate quotes at £3,372, with £1,380 of materials (Rate Sorted, November 2026).
Check my day rate firstThe sample uses a starting rate, and yours comes from your own costs.

A quote is not an estimate

A quote
A fixed price for the work you have described.

Say exactly what is included, and exactly what is not.

Put an expiry date on it, so the customer knows how long the price stands.

An estimate
Your best guess, which can move as the job opens up.

Call it an estimate in writing, in as many words.

Say what would change it, and agree how you will tell them.

Send a quote for work you can see, and an estimate for work you cannot.

Questions about a building quote

A merchant receipt, a calculator and a notebook of figures on a rainy van dashboard. Generated image.
Materials go on the quote at cost plus your markup.

What should a builder’s quote include?

Your details and the client’s, the work in plain steps, and the days on site.

Then labour and materials split out, one total, what is not included, and how long the price stands.

How do I price a building job?

Set the days the work will take, then times them by your day rate for the labour.

Add materials with your markup on top.

The sample is 6 days at £332, plus £1,380 of materials.

Should I add a markup on materials?

If you buy, fetch and carry them, charge for that time too.

The sample adds 20%, the figure the Rate Book starts you on, which turns £1,150 into £1,380.

How much tax should I put aside from this job?

The profit in it is £2,222, the labour plus the markup on materials.

Put £501 aside.

That is 22.53%, the tax share on a yearly profit of £58,084.

Should a builder’s quote include the steel and the engineer?

Name them either way, in the price or on the not included line.

The sample leaves the engineer’s calculations and building control fees out, and says so.

Can I download it as a PDF?

The quote writer makes a PDF from your own figures, and your email address unlocks it.

There is no Word or Excel version to download.

The day rate is the calculator’s required rate for a general builder, not a typed figure.The 20% markup on materials is the figure the Rate Book starts you on. Change it to yours.The knock through, the 6 days and the materials are a stated sample, and yours will differ.Rates reviewed November 2026
Work out your day rateFree, no login, and your numbers stay in your browser.
Get My Rate BookThe £39 General builder Rate Book helps you price jobs, plan tax and track unpaid invoices.

Reviewed on .

These figures use the same sums as the free calculator, so the two always agree.