Construction quote template
A free construction quote template for builders and contractors, filled in with every sum shown.
Free with no login, and the day rate is the calculator’s own answer, reviewed November 2026.
- The site address, and how you get materials on to it.
- The stages in order, from strip out to the finished wall.
- The days on site, which is what the customer is really buying.
- Anything left out, named in writing so nobody argues later.
The quote, filled in
A sample construction job priced at the day rate a general builder needs.
Sample figures, and it works as a contractor quote template too.
The job. Front garden wall, 8 metres, taken down and rebuilt.
- Take down the old wall and clear the rubble
- Dig out and pour a new footing
- Build the new wall in brick with a coping on top
| Time on site | 5 days |
|---|---|
| Labour | £1,660 |
| Materials, supplied | £768 |
| Total | £2,428 |
Not included. Skip hire, gates and any work to the drive.
VAT. A blank line, for you to fill in either way.
Payment. A blank line for your own terms, which we do not write.
- Work agreed in a customer’s home carries a right to cancel.
- This template does not carry that wording, and we are not the ones to write it.
- Ask a solicitor, or Citizens Advice, before you hand it to anyone.

How a wall comes to its total
Labour first, then bricks, sand, cement and the footing concrete, then your markup.
- Labour£1,660
- Materials at cost£640
- Your markup£128
| Line | Amount |
|---|---|
| Labour, 5 days at £332 | £1,660 |
| Materials at cost | £640 |
| Your markup on them, 20% | £128 |
| Quote the job at | £2,428 |
The £332 is the day rate calculator’s answer for a general builder on its starting figures.

Cite this figure
Fixed price or day work
Best when you can see the whole job before you start.
Your days have to be right, because overruns come out of your pocket.
Common where the ground or the old wall could hide surprises.
Keep a daily record of who was on site and what was used.
Either way, the price only works if the day rate under it is right.
Questions about a construction quote

What should a construction quote include?
Your details and the client’s, the work in plain steps, and the days on site.
Then labour and materials split out, one total, what is not included, and how long the price stands.
How do I price a construction job?
Set the days the work will take, then times them by your day rate for the labour.
Add materials with your markup on top.
The sample is 5 days at £332, plus £768 of materials.
Should I mark up bricks, sand and cement?
If you buy, fetch and carry them, charge for that time too.
The sample adds 20%, the figure the Rate Book starts you on, which turns £640 into £768.
How much tax should I put aside from this job?
The profit in it is £1,788, the labour plus the markup on materials.
Put £403 aside.
That is 22.53%, the tax share on a yearly profit of £58,084.
Should I quote day work or a fixed price?
A fixed price suits work you can see from start to finish.
Day work charges your £332 for each day worked, and suits jobs that could open up.
Can I download it as a PDF?
The quote writer makes a PDF from your own figures, and your email address unlocks it.